We contribute to the world manufacturing industry through the production and sales of the Air-Hyrauric Equipment.

  • 日本語
  • English
  • 한국어

Operation image

Pneumatic-Hydraulic Conversion Booster

     
Rush Booster

Vertical installation






This is a usage method where the lash booster is installed vertically.

When installing the Rush Booster vertically, connect the gauge tank that comes with the Rush Booster using elbow piping, etc. so that the fuel filler cap (red) is on the top of the tank.

If the actuator and hydraulic piping are located higher than the oil discharge port of the Rush Booster, install an "air release valve" at the actuator's hydraulic piping port and at the highest position of the hydraulic piping.
Also, when installing with the oil discharge port facing upward, provide an "air release valve" at the oil discharge port.